Re: My physical verification ... results
Posted by Skywise on November 03, 2013 at 17:50:50:

OK. I did testing on only those 161 quakes of magnitude 6.5 and larger. I tested them as the predicted magnitude.


Total Predictions: 161
Total Hits: 24
Standard Deviation: 9.0328428
Normalized Score: -0.4819822
Percentile: 31.49

And the graph shows the results of the same but with 1 million runs of randomized dates.

As can be seen, random chance peaks at 26 hits. Actual result was 24 hits.

Brian


Follow Ups:
     ● Re: My physical verification ... results - Skywise  17:51:36 - 11/3/2013  (101290)  (0)